Projects

Executed construction works during the last five (5) years

Client

 

 Project/Location

 

Type of Work

 

 Year

 

Contr. Value

 

PFD

 

SGP PFD-1967,
Tengiz.
Electrical Construction Services

 

Electrical
Construction
Works

 

2006-2007

 

US$  9,0 Million

 

KASZTOJ-
INVEST

 

USL-05, Prorva.
Surfacing External and Internal Roads

 

Asphalt production and supply, road construction

 

2006

 

US$  0,4 Million

 

TCO

 

Crude Export Project
OK 56360

 

Crude Export Oil Rail Loader Facility Construction

 

2005-
2007

 

US$  8,9 Million

 

PFD

 

1925_Master Contract for Multidiscipline Jobs

 

Time Sheet Based Frame Contract for SGP Construction Works

 

2005-
2007

 

US$  20 Million

 

PFD

 

1698_Sulphur Forming Civils and Undergrounds

 

Sulphur Forming Plant Civil Works

 

2005

 

US$  1,5 Million

PFD

 

Contract 571500-9-1685 - Surfacing to Southern Section of Western Road /
Tengiz SGP Area

 

Asphalt production and supply, road construction

 

2004

 

US$  3,45 Million

AGIP KCO

 

Utility Area Buildings (Engineering and Procurement of process buildings). / Karabatan

 

Engineering/ Design and Procurement of process buildings.
Chemimontazh involved as a supervisor of the Project Management group of Vegyépszer Co.Ltd.

 

2004

 

US$  3,54 Million

TCO

 

Train 2.3 GTS – Mechanical and Civil Works / Train 2.3., Tengiz

 

Mechanical works

 

2003

 

US$ 0,7 Million

TCO

 

Train 2.3 GTS – Electronical and Instrumental Works / Train 2.3., Tengiz

 

Instrumental Works

 

2003

 

US$ 0,3 Million

PFD

 

571500-0-1656/Tengiz
Republic of Kazakhstan

 

Concrete Batch Plant Construction and Concrete
production

 

2003-2005

 

US$ 3,54 Million

Munaygaz-kurylis

 

И/1.CMP-01/2003/Tengiz
Republic of Kazakhstan

 

Asphalt production

 

2003

 

US$ 5.7 Million

TCO

 

OM223/Tengiz
Republic of Kazakhstan

 

Asphalt production

 

2003

 

US$ 0.9 Million

TCO

 

OM223/Tengiz
Republic of Kazakhstan

 

Plant Maintenance
(Annual Turnaround)

 

2003

 

US$ 5.84 Million

Brown & Root Inc. Int. Houston

 

EJ-0192-Oil Field Development Project /
Algeria

 

Pipeline Installation BKNE Field work, including water reinjection pipeline,gas pipeline and
108 km long oil transport pipeline construction
 

 

2002

 

US$ 6.6 Million

TCO

 

OM223 /
Tengiz, Republic of Kazakhstan

 

Plant Maintenance

 

2002

 

US$ 4,5 Million

TCO

 

KTL-II LPG Upgrade /
Tengiz, Republic of Kazakhstan

 

KTL-II Low Pressure Gas Upgrade Project: purchasing, constructing , assembling, installation, test, etc.

 

2001

 

US$ 7.9 Million

TCO

 

DCN /
Tengiz, Republic of Kazakhstan

 

Crude Oil Degassing, Caustic Neutralization Turn key Project

 

2000-2001

 

US$ 4.54 Million

GEII

 

Power Station / Karachaganak
Republic of Kazakhstan

 

Power Station Building

 

1999-2001

 

  US$ 11.2 Million

Fluor Daniel Caspanian Service Limited

 

OK2560/07/
Tengiz, Republic of Kazakhstan

 

PIPEWORK-LOADING RACK

 

2000

 

US$ 1,5 Million

Bechtel Enka JVC

 

24343-PR12-SSC-012-TCO PROGRAM 12 / Tengiz, Republic of Kazakhstan

 

Sulfur Recovery Units (SRU) refurbish and increase the handling capacity of the existing SRUs.

 

2000

 

US$ 3,5 Million

Brown & Root Inc. Int. Houston

 

EJ-0199-Oil field development Project /Algeria

 

Assembling, instrumentation, electrical works, turbine assembling

 

1997-2002

 

US$ 11.5 Million

TCO

 

OM130/Tengiz,
Republic of Kazakhstan

 

Plant Maintenance
(Vegyepszer)

 

1996-2001

 

US$ 38 Million

HUNOR Russian-Hungary Joint Venture of Orenburg

 

Railway Loading Terminal of 3,150,000.00 cubic meter stable condensating gas per a year / Orenburg, South Ural District of Russia

 

Design, Assembling Installation and Commission

 

1998-2000

 

US$ 7.5 Million

Bechtel Enka JVC

 

TCO KTL-2/3 Expansion (Train 5) /Tengiz
Republic of Kazakhstan

 

Assembling, instrumentation installation

 

1998-2000

 

US$ 30 Million

Bechtel- Enka JVC

 

Debottlenecking/ Tengiz
Republic of Kazakhstan

 

Assembling, installation etc.

 

1997-2000

 

US$ 6.3 Million

KAZAKH TURKMUNAI JVC

 

Oil field development /Jelemes-Saztiube
Republic of Kazakhstan

 

Construction, assembling/ instrumentation, etc.

 

1998-1999

 

US$ 10 Million

Hurrican Munai JVC

 

Office buildings and industrial base installation /Kzil-Orda,

 

Building assembling

 

1998

 

US$ 0.8 Million

 
 